Hello, iam George Campbell, Take it easy.

How Long Did Shrek Take To Render? [Solved]

The original Shrek movie required five million rendering hours; Shrek 2* required 10 million; and Shrek the Third required 20 million. In 2010, the final Shrek feature film, Shrek Forever After*, consumed over 45 million rendering hours.

Each Shrek movie had longer render times than the one before it

How Tall is Shrek

Shrek 1 Technical Goofs

Shrek

Shrek İlk Tanışma - Chase#2 w/Sir Render

cok korkunc tpleniyor (pingten dolayı değil buga girdi.)